Expedia’s new campus is 40 acres and features views of Seattle’s skyline, Elliot Bay, and the Olympic Mountains.
To meet the parking requirements, the lowest parking level and building slabs had to be constructed below the existing water table necessitating a solution capable of withstanding high hydrostatic pressure.
Hycrete’s System W provided a superior solution in terms of cost effectiveness and accelerated construction schedule. Using Hycrete eliminated the need for waterproofing membranes and saved GLY a significant amount of time and money.
The construction schedule was shortened, saving Expedia time and money. By using Hycrete's System W, they also received a non-absorbent concrete surface that is easy to maintain with a 10-year performance warranty. Overall, the property owner gets a company they can count on to keep their building dry and continue operations without interruptions. Additional Benefits • No Additional Labor Required • Disruptive Maintenance and Down-Time Avoided • Warranted-Performance