Case Study

Expedia Campus

Hycrete Waterproofs Expedia's New Campus
Hycrete allowed us to get our parking garage slab placed sooner and avoid weather delays.
Laif Pederson, GLY Construction

Introduction

Expedia’s new campus is 40 acres and features views of Seattle’s skyline, Elliot Bay, and the Olympic Mountains.

Structure:
Office Campus
Applications:
Slab-on-Grade (1 level below-grade) for parking garage, slabs and walls of office building G and H
Architect:
ZGF Architects
Engineer:
KPFF
General Contractor:
GLY Construction
Owner - Developer:
Seneca Group
Ready Mix Provider:
Cadman
Product Type:
Hycrete360 (formerly System W)

Challenge

To meet the parking requirements, the lowest parking level and building slabs had to be constructed below the existing water table necessitating a solution capable of withstanding high hydrostatic pressure.

Solution

Hycrete’s System W provided a superior solution in terms of cost effectiveness and accelerated construction schedule. Using Hycrete eliminated the need for waterproofing membranes and saved GLY a significant amount of time and money.

Result

The construction schedule was shortened, saving Expedia time and money. By using Hycrete's System W, they also received a non-absorbent concrete surface that is easy to maintain with a 10-year performance warranty. Overall, the property owner gets a company they can count on to keep their building dry and continue operations without interruptions. Additional Benefits • No Additional Labor Required • Disruptive Maintenance and Down-Time Avoided • Warranted-Performance

More Case Studies

Thousands of Success Stories Worldwide

Hycrete’s proven technology has protected thousands of structures worldwide.
How to Get Started

See How Hycrete Can Impact Your Project

Let our in-house team assist. Our proven 3-step process provides everything you need to build with better concrete.

© 2022 Hycrete. All rights reserved.

Privacy Policy | Cookie Policy

Contact Us